Jan 17, 2018

What additional activities would you add to this project to make it more complete, from a project management viewpoint?

This paper concentrates on the primary theme of What additional activities would you add to this project to make it more complete, from a project management viewpoint? in which you have to explain and evaluate its intricate aspects in detail. In addition to this, this paper has been reviewed and purchased by most of the students hence; it has been rated 4.8 points on the scale of 5 points. Besides, the price of this paper starts from £ 45. For more details and full access to the paper, please refer to the site.

Project Schedule

Due Week 6 and worth 150 points

This assignment consists of two (2) parts: a project schedule, and a written response. You must submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule

(Submit as one [1] Microsoft Project file)

  1. In Assignment 2, you developed a project plan. Now, using the information from your project proposal, create a multi-level work breakdown structure (WBS) and detailed project schedule.

    Your project must include the following criteria:

    • The project must consist of at least twenty-five (25) tasks.
    • Each task must contain a start date, a finish date, and have main staffing and non-staffing resources assigned.
    • Assume that your work activities are completed during normal weekdays (no weekend work) under normal conditions (8 hours per day).
    • In terms of holidays, you can assume no work will be done the following days: New Year’s Day, President’s Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year’s Eve.

Part B: Written Response

(Submit as a Microsoft Word file)

Write a one to two (1-2) page response in which you:

  1. Analyze your project in terms of project completion, critical path, and slack / float. Specifically, be sure to answer the following:
    • When will the project be completed?
    • What is the critical path for the project?
    • How much slack / float is in your project? What activities have the greatest slack / float?
  2. Summarize the recommendations or improvements you would make to your project schedule. Specifically, be sure to answer the following:
    • Identify the top three (3) activities that you believe could impact the project completion date.
    • What additional activities would you add to this project to make it more complete, from a project management viewpoint?
  3. Format your assignment according to the following formatting requirements:
    • Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.
    • Include a cover page containing the title of the assignment, the student’s name, the professor’s name, the course title, and the date. The cover page is not included in the required page length.

.strayer.edu/bbcswebdav/institution/BUS/375/1158/Week6/Week%206%20Assignment%204%20Rubric.html”>Click here to view the grading rubric.

.kaltura.com/index.php/extwidget/openGraph/wid/1_13m4bbfv”>If you need help with submitting the assignment, click here to view a video on submitting a clickable rubric assignment


100% Plagiarism Free & Custom Written,
Tailored to your instructions


International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

UK Registered Company # 11483120


100% Pass Guarantee

Order Now

STILL NOT CONVINCED?

We've produced some samples of what you can expect from our Academic Writing Service - these are created by our writers to show you the kind of high-quality work you'll receive. Take a look for yourself!

View Our Samples

FLAT 50% OFF ON EVERY ORDER.Use "FLAT50" as your promo code during checkout