Sep 25, 2017 term paper 2

PRACTICE, M-GLOBAL CONTEXT: MEMO REPORT ASSUME YOU ARE AN M-GLOBAL FIELD ENGINEER WORKING AT THE…

This paper concentrates on the primary theme of PRACTICE, M-GLOBAL CONTEXT: MEMO REPORT ASSUME YOU ARE AN M-GLOBAL FIELD ENGINEER WORKING AT THE… in which you have to explain and evaluate its intricate aspects in detail. In addition to this, this paper has been reviewed and purchased by most of the students hence; it has been rated 4.8 points on the scale of 5 points. Besides, the price of this paper starts from £ 40. For more details and full access to the paper, please refer to the site.

Practice, M-Global Context: Memo Report

Assume you are an M-Global field engineer working at the construction site of a nuclear power plant in Jentsen, Missouri. For the past three weeks, your job has been to observe the construction of a water-cooling tower, a large cylindrical structure. As consultants to the plant’s construction firm, you and your M-Global crew were hired to make sure that work proceeds properly and on schedule. As the field engineer, you are supposed to report any problems in writing to your project manager, John Raines, back at your St. Louis office. Then he will contact the construction firm’s office, if necessary.

Write a short memo report to Raines. Take the following randomly organized information and present it in a clear, well-organized fashion. If you wish, add information of your own that might fit the context.

¦ Three cement pourings for the tower wall were delayed an hour each on April 21 because of light rain.

¦ Cement-truck drivers must slow down while driving through the site. Other workers complain about the excessive dust raised by the trucks.

¦ Mary Powell, an M-Global safety inspector on the crew, cited 12 workers for not wearing their hard hats.

¦ You just heard from one subcontractor, Allis Wire, Inc., that there will be a two-day delay in delivering some steel reinforcing wires that go into the concrete walls. That delay will throw off next week’s schedule. Last Monday’s hard rain and flooding kept everyone home that day.

¦ It is probably time once again to get all the subcontractors together to discuss safety at the tower site. Recently, two field hands had bad cuts from machinery.

¦ Although there have not been any major thefts at the site, some miscellaneous boards and masonry pieces are missing each day—probably because nearby residents (doing small home projects) think that whatever they find at the site has been discarded. Are additional “No trespassing” signs needed?

¦ Construction is only two days behind schedule, despite the problems that have occurred.

NOTE: PLEASE USE THE ATTACHED NAMED “MEMO SAMPLE” AS AN EXAMPLE TO WRITE THIS MEMO. THE WRITE SHOULD LOOK LIKE THE MEMO SAMPLE.

500 Words or 2 pages

NO PLAGIARISM


0% Plagiarism Guaranteed & Custom Written, Tailored to your instructions


International House, 12 Constance Street, London, United Kingdom,
E16 2DQ

UK Registered Company # 11483120


100% Pass Guarantee

Order Now

STILL NOT CONVINCED?

We've produced some samples of what you can expect from our Academic Writing Service - these are created by our writers to show you the kind of high-quality work you'll receive. Take a look for yourself!

View Our Samples

corona virus stop
FLAT 25% OFF ON EVERY ORDER.Use "FLAT25" as your promo code during checkout