Illustrate and explain the precedence system of notation, using as an example a project to construct a supermarket with a first floor storage area

Illustrate and explain the precedence system of notation, using as an example a project to construct a supermarket with a first floor storage area

PLANNING & SCHEDULING

 

Instructions to candidates:

 

a) Time allowed: Three hours (plus an extra ten minutes’ reading time at the start – do not write anything during this time)

b) Answer any FIVE questions

c) All questions carry equal marks. Marks for each question are shown in [ ]

 

1. Illustrate and explain the precedence system of notation, using as an example a project to construct a supermarket with a first floor storage area. [20]

 

2. Brainstorming meetings are widely recognized as being a useful way of kicking off a project. Explain the factors that need to be taken into account in arranging and holding a brainstorming meeting. [20]

 

3. Error trap is something which project managers need to be very aware of in delivering a project. Analyze the term error trap and explain how it can be overcome. [20]

 

4. Review how events over which a project manager can have no control may impact on the delivery of a project. [20]

 

5. Explain the stages involved in developing a project resource schedule. [20]

 

6. Review the concept of float, explaining its significance in project management. [20]

 

7. Projects rely on effective cash scheduling to ensure that delivery plans are met. Analyse how cash can be scheduled in a project. [20]

 

8. Analyze the circumstances in which it is generally accepted that it is more appropriate to draw a network diagram from right to left rather than left to right. [20]