This paper concentrates on the primary theme of 1. Baweja (2006) presents CPM scheduling in the framework of the construction industry. Present how you would take the basic methodologies discussed and convert them for the management of a large software development project. in which you have to explain and evaluate its intricate aspects in detail. In addition to this, this paper has been reviewed and purchased by most of the students hence; it has been rated 4.8 points on the scale of 5 points. Besides, the price of this paper starts from £ 79. For more details and full access to the paper, please refer to the site.
See files attached.
1. Baweja (2006) presents CPM scheduling in the framework of the construction industry. Present how you would take the basic methodologies discussed and convert them for the management of a large software development project.
2. Analyze the techniques discussed in the Guldemond et al. article (2008) and propose how you would apply them to your own skill set as a Project Manager.